This Bulletin summarizes the requirements of State ADU law for the convenience of ADU builders. Upon adoption of a local ADU ordinance by the City Council, this Bulletin shall become ineffective. This Bulletin is subject to periodic updates, as ADU law changes, or California Department of Housing and Community Development (HCD) policies change. Dates of updates will be noted next to the effective date in the title above.
- Lot Types
Lot type is the first factor in determining which ADU(s) can be allowed. A single-family dwelling lot has one or more detached single-family dwellings and no multi-family dwellings. A multi-family dwelling has two or more principal dwelling units in one building, or as attached buildings. “Attached” is defined in Section 21.15.250. Both existing and proposed principal (non-ADU) units are considered in determining if a lot is single- or multi-family. - Number, Type, and Size of ADUs Permitted
Table 1 describes the different scenarios of number, type and size of ADUs permitted. - Building Height Limits
Table 2 describes the height limits for different ADU project types. - Setbacks
Table 3 describes the building setbacks applicable to ADUs. - Minimum Unit Size
Any ADU or JADU must be at least 150 sq. ft. in size to comply with the definition of “efficiency unit” per Cal. Health and Safety Code §17958.1. - Lot Coverage, Open Space, Floor Area Ratio, and Other Standards
No standards for lot coverage, open space, or floor area ratio apply to the project types listed in this Information Bulletin. This also excludes open space standards for the primary dwelling, landscaping, street trees, and permeability standards. - JADU Access and Owner Occupancy Requirements
Owner occupancy of the single-family dwelling or the JADU only is required if the JADU shares a bathroom with the primary dwelling. A JADU with a shared bathroom and access to the primary dwelling is not required to have its own separate exterior entrance. A JADU always must have its own kitchen. - Unit Type Combinations
At a single-family lot, one conversion ADU and one detached new construction ADU can be permitted, in addition to one JADU.
At a multi-family lot, detached ADU(s), and ADU(s) created through conversion of existing attached non-habitable space, can be permitted. The detached ADU(s) may consist of new construction, conversion of accessory building(s), or addition to and conversion of accessory building(s). No addition is permitted for conversion of attached non-habitable space. No JADU is permitted on any lot with a multi-family dwelling.
For a lot with a single-family dwelling and a multi-family dwelling, each type of SFD ADU is permitted for the SFD, and each type of MFD ADU is permitted for the MFD, as applicable to the circumstances. However, an SFD ADU cannot be applied to the MFD or vice versa. No JADU is permitted on any lot with a multi-family dwelling, regardless of the presence of a single-family dwelling.
- Parking
No parking is required for any of the following circumstances:- For an ADU located within one-half mile walking distance of any transit stop (see ADU Parking Exemption Map).
- For an ADU in a historic district.
- For an ADU converted from a portion of the primary dwelling or an accessory building.
- For an ADU when on-street parking permits are required on the adjacent street but are not offered to the ADU occupant (burden of proof is on applicant).
- For an ADU within one-half mile of a car share vehicle (burden of proof is on applicant).
- When an ADU application is submitted in conjunction with an application for a new SFD or MFD, if any of the above apply.
- For a JADU.
- For an ADU located within the Parking Exempt Area established by Section 21.41.175.
- Floor Area Measurement
The floor area of an ADU is measured only to the interior walls as required by state law. This measurement method shall apply only to calculating the allowable living area of an ADU. All other development standards shall be calculated using Gross Floor Area (GFA) as defined in Section 21.15.1070 of the Zoning Regulations and measured to the outside surfaces of exterior walls. - Application Requirements
An ADU project applicant is required to submit all the plans and information required for a building permit. The applicant must provide any additional plans and information requested, and must make all required corrections, before the application will be considered complete. - Coastal Zone Procedures
Any ADU or JADU project in the Coastal Zone is required to obtain an Administrative Local Coastal Development Permit (LCDP). No public hearing is required. The LCDP must be filed concurrently with the building permit application. - Historic Procedures
Any ADU or JADU project in a historic district, or at a designated historic landmark property, must obtain a Certificate of Appropriateness (COA). No public hearing is required. The COA must be filed concurrently with the building permit application. - Refuse (Trash, Recycling, and Organics)
As required by the Long Beach Municipal Code for all dwelling units, the following refuse requirements apply to an ADU or JADU project: - One to Three Units on site. For a lot with one to three dwelling units (of any type), adequate refuse receptacles shall be provided for each unit, as required by Chapter 8.60, LBMC.
- Four or More Units. For a lot with four or more dwelling units (of any type), common refuse area(s) shall be provided with receptacles in sufficient quantity to accommodate all refuse generated, as required by Chapter 8.60, LBMC. Trash enclosures shall be provided per Section 21.45.167.
1CHAPTER 13. Accessory Dwelling Units [§§66310 - 66342], Cal. Gov’t Code.