Back
-
Documents
- City Manager (21)
Did you mean
xss/oa_html/ibecacpssoreg.jsp''[0] ,
xss/oa_html/ibecacpssoreg.js'[0]'' ,
xss/oa_html/ibecacpssoreg.js'[0]' ,
what is recycleable ,
“history of city hall bbudget meetingsuilding'a=0 ,
ãƒæ’ã‚â¢ãƒâ€šã‚â§ 42. caretaker
-
Long Beach Reconnaissance Study Project Management Plan, July 2009
Documents
Coastal) $1,500,000 $0 $1,500,000 JAC00 Feas – Geotechnical Studies/Report $300,000 $0 $300,000 JAE00 Feas ... Analysis Report $400,000 $0 $400,000 JAF00 Feas – Value Engineering $30,000 $0 $30,000 JB000 Feas – SocioeconomicURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/pmp-final
-
09-04-2008 Planning Commission Staff Report
Documents
Report ing Program. Respectfully submitted, C JS 1 CRAIG BECK DIRECTOR OF DEVELOPMENT SERVICES ... Photographs Findings Exhibit C - Findings Exhibit 0 - Conditions of Approval Exhibit E - Letter of OppositionURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/colorado-lagoon-restoration/09-04-2008-planning-commission-staff-report
-
Naples Seawalls Outreach Letter FINAL 1-7-14
Documents
Naples Seawalls Outreach Letter FINAL ... GUARDRAIL - OPTION 1 - SECTION 3 4" = 1'-0" 3 4" = 1'-0" OPTION 1 NAPLES ISLAND PERMANENT ... SECTION DEC 2013 24 " 42 " 5'-0" 9" 3'-0" EL. 13.00 EL. 11.50 TOPURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples-seawalls-outreach-letter-final-1-7-14
-
Naples LSFS Report_Rev3FINAL
Documents
(kips/foot) DISPLACEMENT AT ELEV. +7 (inches) Static 0 4.1 <1.9 Operating Level Earthquake (OLE) 0.17g 5 ... (kips/foot) DISPLACEMENT AT ELEV. +7 (inches) Static 0 4.1 <1.9 Operating Level EQ (OLE) 0.17g 5.7 3.1URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/naples-lsfs-report_rev3final
-
Presentation at Community Meeting, April 2016
Documents
Presentation at Community Meeting, April 2016 ... noaa.gov/habitat/habitat_types/habitat_ types_1.html BUILDING STRONG® Eel Grass Giant Kelp ForestURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/community-participation/espb-public-scoping-meeting-ppt_4-7-16_web
-
Online Response Summary
Documents
info – 333 W. Ocean Blvd, Long Beach, CA 90802 18% 0% 14% 68% Response Distribution 1 2 3 4 QUESTION: ... 18% 2. No comment on the optional lighting 0 0% 3. Only dim/soft lighting along the path isURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/online-response-summary
-
Sorrento Trail Concept Presentation
Documents
walkways • Walkway not accessible from the bridge N 0' 40' 80' NEW ADA ACCESSIBLE RAMP SITE BOUNDARY ... EXTENSION PLANTED TREE WELL W/STREET TREE WALKWAY (5'-0" WIDE) Sorrento Alamitos Bay Shoreline Trail | ConceptURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/2015-1012_sorrento-trail-concept-presentation-final--002-
-
Access Requirements for Alamitos Bay Shoreline Sorrento Trail
Documents
Access Requirements for Alamitos Bay Shoreline Sorrento Trail ... http://codes.findlaw.com/ca/government-code/ gov-sect-4451.html#sthash.3z1pKsqs.dpuf... (f) Administrative authoritiesURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/shorelinetrail-finalsummary
-
Sorrento Trail Geotechnical Report 2015
Documents
MATERIALS SITE PLAN FIG. 2Checked By: GAK/SFK 0 100' 200' Drafted By: SB LEGEND Approximate Location ... GEOTECHNICAL MATERIALS REGIONAL FAULT MAP FIG. 3 0 12 24 Miles Drafted by: SB Checked by: GAK/SFK SITEURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/a9218-06-01-sorrento-alamitos-bay-shoreline-trail-gi-061115
-
10033-002 Bluff Park Peer Review Final (1)
Documents
Beach Fill Sand/Sand with Silt 0 32 Beach Deposit Sand/Sand with Silt 0 34 Colluvium Sand, Silty Sand ... 50 - 125 35 – 36 Import Fill Sand and Silty Sand 0 - 50 32 Groundwater was encountered in the boringsURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/bluff-erosion-phase-ii/10033-002-bluff-park-peer-review-final--1-