Did you mean
planet bid'a=0 ,
planetbid'a=0' ,
planetbid'a=0 ,
(562) 5702726 ,
“melvin price” ,
ãƒâ£ã‚â§ãƒâ¥ã‚â¡ãƒâ¢ã‚â¼shouldtake0'and'o'='o
-
Victoria Street between Susana Road and Long Beach Boulevard
City Web Pages
street construction in the area in April 2024, with a scheduled completion, barring weather or other unforeseen ... 7:00 AM to 3:30 PM. No parking signs will be posted a minimum of three days prior to the start of work.URL/pw/projects/victoria-street-between-susana-road-and-long-beach-boulevard/
-
Preventing Cigarette Litter
City Web Pages
establishments shall provide and empty a tobacco waste receptacle, such as a cigarette urn or ash tray, in each ... and the area surrounding it shall be maintained in a sanitary manner. Additionally, Long Beach City CodeURL/pw/resources/litterfreelb/can-your-butts-program/preventing-cigarette-litter/
-
Magnolia Tree Tuliptree Scale Infestation
City Web Pages
addition, the tuliptree scale produces a considerable amount of honeydew, a sticky substance that can coat sidewalks ... infestation and full infestation. The table below provides a summary, based upon the level of severity: MagnoliaURL/pw/services/public-trees/tuliptreescale/
-
Public Trees
City Web Pages
inspected to determine the trees condition and decipher a plan of action. Tree trimming requests are prioritized ... Instructions before submitting a Tree Planting Permit Application. Report a Public Tree Issue Report a public tree issueURL/pw/services/public-trees/
-
LB-MUST
City Web Pages
of first flush stormwater (the initial runoff from a storm that contains the highest concentration of pollutants) ... when draining toward the river.The treatment facility has a capacity to treat 2 million gallons of water per day through ceramicURL/pw/projects/lbmust/
-
Santa Fe Avenue Project
City Web Pages
pedestrian crosswalks to ensure a safer and more efficient transportation system. A key highlight of the project ... project represents a significant investment in the city’s infrastructure, aimed at creating a safer, more efficientURL/pw/projects/santa-fe-avenue-project/
-
Harding Street Between Atlantic Avenue and Orange Avenue
City Web Pages
begin construction in the area in December 2023 with a scheduled completion, barring weather or other unforeseen ... AM to 3:30 PM. No parking signs will be posted for a minimum of three days prior to the start of work.URL/pw/projects/harding-street-between-atlantic-avenue-and-orange-avenue/
-
Davenport Park (Phase I & II) Project
City Web Pages
Gas Control System and a Park Expansion. The Park Expansion project includes a sports field, fitness stations ... Air Quality Management District (SCAQMD). In 2014, a temporary treatment system was established to reduceURL/pw/projects/davenport-park-phaseii-project/
-
El Dorado Duck Pond Project
City Web Pages
Dorado Duck Pond Restoration Project which includes a new pond liner, wetlands, forebay, pedestrian walkway ... fishing or swimming is permitted. Please join us at a Ribbon Cutting Ceremony for the El Dorado Duck PondURL/pw/projects/el-dorado-duck-pond-project/
-
City Place Garage Mural Restoration
City Web Pages
Auditorium and raised in 1979. The mural was saved by a community effort and installed at its current location ... of the Elevate ’28 Infrastructure Investment Plan, a historic initiative dedicated to enhancing Long BeachURL/pw/projects/city-place-garage-mural-restoration/