Back
-
Documents
- City Manager (35)
Did you mean
look up citations by liscence plate ,
look up citations by liscenceplate ,
lookup citations by liscence plate ,
tourof california ,
“soft story”-- or '''" ,
�history'
-
Access Requirements for Alamitos Bay Shoreline Sorrento Trail
Documents
length at 8.33% maximum slope; a 30’ length can go up to a 10% slope, and a 10’ length can be 10% to 12% ... paved or has boards otherwise it is permitted to be up to 5% maximum only when necessary for drainage •URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/shorelinetrail-finalsummary
-
09-04-2008 Planning Commission Staff Report
Documents
parkways). 12. Exterior security bars and roll-up doors applied to windows and pedestrian building ... 2008 Page 15 • Install wheel washers or steel plate rumble strips where vehicles enter and exit unpavedURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/colorado-lagoon-restoration/09-04-2008-planning-commission-staff-report
-
BP_TempImpvment_Public Notice_Con_
Documents
BP_TempImpvment_Public Notice_Con_ ... temporary pool and the • Placement of 3 metal roll-up door storage containers at the temporary pool •URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/belmont-aquatics-center/bp_tempimpvment_public-notice_con_
-
Presentation at Community Meeting, June 2013
Documents
Accelerate City Funds • Pay 75 percent of costs (up from 50%) • Consultant assistance to ensure Long ... Rescoping Charette Session *Jan 2014 Feasibility Study Up to 3 yrs Army Corps to secure $750,000 federal shareURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/east-san-pedro-bay-presentation_fcsa-amend_6-6-13
-
City Council Motion, March 2013
Documents
Army Corps of Engineers (Army Corps) to contribute up to $50,000 in existing authorized local-sponsor funds ... at least four years. The City Council authorized up to $3,320,700 of Tidelands funding to meet the City'sURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/031213-r-17sratt
-
Presentation at Community Meeting, May 2011
Documents
Study July 24, 2007: City Council voted to approve up to $100,000 of Tidelands funds for the Reconnaissance ... Identifies the possibility to create up to 500 acres of kelp bed and up to 300 acres of rocky reef habitatURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/east-san-pedro-bay-presentation_5-25-11
-
Alamitos Beach Concession Open House June 4 2016
Documents
Lowenthal both spoke to the attendees. The set up for the Open House included six stations, each with ... from more traditional work out facilities like pull-up bars and children’s playground structures to multi-URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/alamitos-beach-concession-facility-rebuild/alamitos-beach-concession-building---community-outreach-6.4.16
-
Sorrento Trail Concept Presentation
Documents
PEDESTRIAN ACCESS PUBLIC WALKWAY RESIDENCES (5609 AND UP) NO IMPROVEMENTS TO BE MADE, SAND EDGE TO REMAIN ... to bridge path Widen street Address algae build-up on shore (slippery) Improve connectivity within neighborhoodURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/2015-1012_sorrento-trail-concept-presentation-final--002-
-
Presentation to Mayor and City Council, June 2010
Documents
Possibility to create up to 500 acres of kelp bed Potential to create up to 300 acres of rocky ... reef habitat Potential for wave heights up to 4 times present size in some areas 21 Long BeachURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/cc_breakwaterpresentation_6-22-10_final_post-on-website
-
Presentation at Community Meeting, April 2016
Documents
Identify Federal Interest in resolving a problem up front Presenter Presentation Notes Identifies next ... Timely 3x3x3 Rule: Completed within 3 Years Cost up to $3 million Coordinate with all 3 levels ofURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/community-participation/espb-public-scoping-meeting-ppt_4-7-16_web