CDP No5-09-071-A2 FINAL PERMIT
Documents
LONG BEACH, CALIFORNlA 90802-4416 PH (562) 590-5071 FAX (562) 590-5084 WWW.COASTAL.CA GOY EDMUND ... Restoration Project (Phase One), which includes: 1) dredging and removal of 32,500 cubic yards of sedimentURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/colorado-lagoon-restoration/cdp-no5-09-071-a2-final-permit
-
CCC Special Condition 14
Documents
CCC Special Condition 14 ... Sig Page from CCC CDP No. 5-11-085 Naples Ph 1 Signed (FINAL)-2 Special Condition 14 from CCC CDPURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/sorrento-trail/ccc-special-condition-14-sorrento-trail
-
Phasing Map
Documents
PHASE 1 PHASE 1A PHASE 2 PHASE 2 PHASE 3 PHASE 3 PHASE 4 PHASE 4 bzein Polygonal Line bzein ... Date: 12/23/2014 Finish Date: 1/8/2015 bzein Text Box PHASE 3 Start Date: 1/16/2015 Finish Date: 3/24/2015URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/beach-pedestrian-path/phasing-map
-
R-6983 Division H
Documents
REQUIREMENTS Tidelands Capital Improvement Division H-1 R-6983 City of Long Beach Division H – General Requirements ... H – General Requirements PART 1 GENERAL PROVISIONS SECTION 1 – TERMS, DEFINITIONS, ABBREVIATIONSURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/r-6983-division-h
-
City of Long Beach Staff Report, June 2010
Documents
BOULEVARD • LONG BEACH, CALIFORNIA 90802 • (562) 570-6711 • FAX (562) 570-6583 PATRICK H. WEST CITY MANAGER ... City's Reconnaissance Study in the following ways: 1. Broader Alternatives: The Army Corps' study broadensURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/long-beach-staff-report_6-22-10
-
Bluff Staff Report 3-14
Documents
333 West Ocean Boulevard • LongBeach, CA 90802 • (562) 570-6711 March 24, 2015 HONORABLE MAYOR AND CITY ... other alternatives to bluff stabilization. On July 1, 2014, the City Council considered a geotechnicalURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/bluff-erosion-phase-ii/bluff-staff-report-3-14
-
Presentation to Mayor and City Council, June 2010
Documents
activity 26 Planning ObjectivesPlanning Objectives 1. Restore and sustain aquatic habitat 2. Improve water ... met with federal dollars – Long Beach submitted a $1 million federal appropriations for the Corps’ shareURL/globalassets/city-manager/media-library/documents/tidelands/ecosystem-study/cc_breakwaterpresentation_6-22-10_final_post-on-website
-
Item 15a
Documents
Item ... Oceangate, Suite 1000 Long Beach, CA 90802-4302 (562) 590-5071 STAFF REPORT: REGULAR ... width of the canal. Filed: 7/30/2013 180th Day: 1/26/2014 Staff: C. Posner - LB Staff Report: 9/27/2013URL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/naples-seawall/w15a-10-2013
-
Phasing Plan Chart
Documents
Location Start Date Finish Date Comment/Closure 1 -Remove Existing Path -Excavate/Form/Pour New Bike ... Shoreline to STA 26+03 (8th Place) 11/26/14 1/8/15 Bike Path closed from Shoreline to 8th PlaceURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/beach-pedestrian-path/phasing-plan-chart
-
BluffPresentationReducedSize
Documents
Erosion Control Nov. 16, 2010 Specs Adopted for Phase 1 of Bluff Erosion and Enhancement Project (Redondo ... 36th Pl. Redondo Ave. Orizaba Ave. 18 Phase 1 • Redondo Ave. to 36th Pl. • Council approval NovemberURL/globalassets/city-manager/media-library/documents/tidelands-capital-impovement-division/bluff-erosion-phase-ii/bluffpresentationreducedsize