Fire Station 14

Fire Station 14 Photo

Additional project updates and information will be published on an on-going basis.

Project Information

Click here for the latest updates.

The Fire Station 14 Project is located at 5200 East Eliot Street and is informed by the Facility Condition Assessment. Health and safety improvements include upgraded plumbing, electrical systems, abatement of materials containing lead and asbestos, roof replacement, smoke alarm system, fire station alerting system, and Americans with Disability Act (ADA) compliant path of travel from the public right-of-way and accessible first floor restroom. Additional upgrades to enhance building configuration, gender accommodations, privacy modifications, and new gym space.

Project Funding

The Fire Station 14 Project is currently supported by $4,895,000 in Measure A funds and $800,000 in other City funds.

Site Plan

Fire Station 14 Site Plan Image

Estimated Project Timeline

*Construction timeline is set barring unforeseen weather changes or other circumstances.

Bid & Award Summer 2023           
Begin Construction Fall 2023
Estimated Completion Late 2024

   Latest Updates


November 2024 Update:

Construction is progressing as planned. Lighting, restroom tiles, exterior painting, HVAC systems, and wooden storage are currently being installed throughout the building.

Cabinet installation image
Cabinet installation
New restroom floor and tiles image
New restroom floor and tiles
 New gym structure image
New gym structure
 Gym lights, fan, and air conditioning unit installed image
Gym lights, fan, and air conditioning unit installed


July 2024 Update:

The construction crew mobilized in late November 2023 and demolition work began on the flooring, walls, concrete slabs and removal of the HVAC systems on the rooftop. In the existing building, trenching and installation of new drain lines for the building, framing walls, drywall and installation of a new roof is in progress. A new energy efficient HVAC system will be installed in July 2024 along with finish tape walls, paint, and new interior ceilings. Additionally, the stand-alone gym building foundation and walls are proceeding on schedule.

Demolition Work Image
Demolition Work
Trenching/Replacement of Drain Lines Image
Trenching/Replacement of Drain Lines
Drywall & Insulation Installation Image
Drywall & Insulation Installation
New Gym Structure Image
New Gym Structure

February 2024 Update:

The City's Contractor, PCN3, began work in November 2023 and is scheduled to be completed, barring weather or other unforeseen delays, by Late 2024.

The contractor is scheduled to perform work Monday through Friday from 7 a.m. to 3:30 p.m. Parking impacts for residents is not expected.

Thank you in advance for your patience and cooperation throughout this project. If you have any questions or concerns, please call the Department of Public Works at (562) 570-5000 or e-mail michelle.harati@haratisolutions.com.