News Details
MASTER FEE AND CHARGES SCHEDULE - OCTOBER 13, 2009
DEPARTMENT:  GAS AND OIL
Fee Name  Description Fee Per
METER INSTALLATION AND REPAIR FEE SCHEDULE    
Meter Reset Charge Charged if it becomes necessary to remove a customer's meter due to tampering.  Must be paid with the reconnection fee prior to restoration of service. $110.00 Per meter
Installing First Meter on a Multiple Meter Set Charged for the installation of the first meter on a multiple meter set. $103 Per first meter
Installing Additional Meters on a Multiple Meter Set Charged for the second and each additional meter installed on a multiple meter set. $82 Per additional meter
Install Individual Service Line Meter Set - Residential 1.5 Charged for installation of an individual service line meter set. $103 for meters sized up to 1.5M, $309 for meters up to 7M ($500 over 5PSI), 11M $515 ($750 over 5PSI) 16M $773 ($1000 over 5PSI) Per meter set
Meter Assembly Repair Charged for the repair of a damaged meter assembly. Excludes cost of meter equipment.  $103 Per hour.
Minimum $103.
If required, new meter will be billed at cost plus 10%
CUSTOMER SERVICE FEE SCHEDULE
Returned Check Charge See Financial Management Fee Resolution - Citywide Charges $33.00 Per returned check
Re-Connection Charged if: A) gas service is terminated for non-payment of bill (must be paid before service will be restored; B) if gas service was temporarily terminated at customer’s request (i.e. summer turn-off); or C) for a temporary turn-on for landlord/owner. $70.00 for single family dwelling unit, or a single non-residential unit, or first dwelling unit of a multi-unit dwelling / $20.00 for each additional unit Unit
Stand-By Service for Alternative Fuel Charge Per Month Charged for providing natural gas service that is used as a backup for another energy-fuel source. $52 Per Account
Demand Test Deposit Fee charged if a customer requests a meter accuracy test for a service meter.  The charge will be refunded if the meter is found to record more than 2% fast. $52.00 Per Test
Service Establishment Charged to establish a new service at the time the account is opened.  Note: Senior citizens and disabled persons who qualify for a reduced gas bill under Municipal Code 15.36.120 shall receive a $20.00 credit against the Service Establishment Charge.  This credit will be applied to the customer’s gas bill upon receipt of certification and will apply only to those who establish a new service on or after July 1, 1995 and who qualify for the reduced gas bill within 120 days after the date of service establishment. $35.00 Per Account
Gas Service Appointment Fee charged to customers requesting a specific appointment time for gas services as compared to service time within a 4 hour time period as provided in California Civil Code Section 1722 (c).  This fee will be charged to the customer’s account for each scheduled appointment.  If the service cannot be performed because the customer is not available at the scheduled time, an additional appointment will be made, which may include an additional fee.           $35.00 Per each scheduled appointment
Unauthorized Removal or Damage to Lock or Flathead This fee will be charged to the customer's account if the meter locking device, installed by LBGO personnel to secure a meter when it is off, is damaged  by the customer or the locking device has been removed and can not be fully recovered. $52 Per meter
Meter Upgrade/Relocation Fee charged when a customer requests a meter upgrade to accommodate increased gas usage, i.e. a pool or when the customer requests their meter be moved to a new location for meter reading purposes or convenience. $103 Per meter
Pilot Lighting Once each year a customer may have the pilot lights on their natural gas appliances lit for free.  Pilot lights lit more than once during a 12-month period are charged a $35.00 service fee. $35.00 Pilot lights lit more than once during a 12-month period
Tented Fumigation Turn off and restore gas services to accommodate tented fumigation.  Fee to be paid by applicant scheduling the fumigation-related services. $35.00 for single family dwelling unit, or a single non-residential unit, or first dwelling unit of a multi-unit dwelling / $16.00 for each additional unit Unit
Weekend Fumigation Service Fee charged to applicant scheduling the fumigation-related services on weekends. $50.00 for single family dwelling unit, or a single non-residential unit, or first dwelling unit of a multi-unit dwelling / $25.00 for each additional unit Unit
Technical Support Rate 7 and 9 transport customers shall pay for each service visit made by LBGO software support technicians at customer's request.  Notwithstanding the foregoing, Customer shall not be obligated to pay any fees in connection with the initial software installation and training visit. $103.00 Per each service visit
Service Re-establishment Charged for visit to reset an earthquake valve and restore gas services. $60.00 Per each service visit
PIPELINE FEE SCHEDULE
CONSTRUCTION OR ALTERATION OF NEW OR EXISTING PIPELINES
Pipeline Construction - 1.25" or smaller using PE Pipe material  Charged for construction or alteration of new or existing pipelines with a diameter of 1.25" or smaller. Discount does not apply, if at the request of the second party, the work cannot be completed in one mobilization.  One mobilization is defined as no break between activities longer than one working day. Base cost of $62.00 for first 100 feet installed.  20% discount to base cost for 101 to 500 feet. 32% discount to base cost 501 to 1,500 feet.  35% discount to base over 1,500 feet of installation. Per foot. Min$1350.  Where applicable, street repair charges will be added.
Pipeline Construction - over 1.25" to 3"using PE Pipe material  Charged for construction or alteration of new or existing pipelines with a diameter over 1.25" to 4".  Discount does not apply, if at the request of the second party, the work cannot be completed in one mobilization.  One mobilization is defined as no break between activities longer than one working day. Base cost of $98.00 for first 100 feet installed.  20% discount to base cost for 101 to 500 feet. 32% discount to base cost 501 to 1,500 feet.  35% discount to base over 1,500 feet of installation. Per foot. min$1350.  Where applicable, street repair charges will be added.
Pipeline Construction - 4" using PE Pipe material  Charged for construction or alteration of new or existing pipelines with a diameter of 4".  Discount does not apply, if at the request of the second party, the work cannot be completed in one mobilization.  One mobilization is defined as no break between activities longer than one working day. Base cost of $160.00 for first 100 feet installed. 20% discount to base cost for 101 to 500 feet. 32% discount to base cost 501 to 1,500 feet. 35% discount to base over 1,500 feet of installation. Per foot. Min$1400.  Where applicable, street repair charges will be added.
Pipeline Construction - over 4" to 8" using PE Pipe material  Charged for construction or alteration of new or existing pipelines with a diameter over 4" to 8"Discount does not apply, if at the request of the second party, the work cannot be completed in one mobilization.  One mobilization is defined as no break between activities longer than one working day. Base cost of $180.00 for first 100 feet installed.  20% discount to base cost for 101 to 500 feet. 32% discount to base cost 501 to 1,500 feet.  35% discount to base over 1,500 feet of installation. Per foot. Min $3200.  Where applicable, street repair charges will be added.
Pipeline Construction - over 8" and all steel pipe irrespective of diameter. Charged for construction or alteration of new or existing pipelines with a diameter over 8"  Discount does not apply, if at the request of the second party, the work cannot be completed in one mobilization.  One mobilization is defined as no break between activities longer than one working day. Actual Cost Per foot. Actual cost for estimating purposes $320/foot. Minimum $4,000.  Where applicable, street repair, and other charges such as shoring and rental equipment  charges will be added.
SERVICE TERMINATION
Pipeline Disconnect Charge-On Property Charged for disconnection of an existing pipeline on a customer's property  $330 Per hour. Minimum $660
Pipeline Disconnect Charge-On Street Charged for disconnection of an existing pipeline on the street  $330 Per Hour. Min$1320.  Where applicable, street repair charges will be added.
PIPELINE REPAIR
Pipeline Repair Charged for repair of damaged pipeline caused by a third party $330 Per Hour. Min $1320.  Where applicable, street repair charges will be added.
MULTIPLE METER SET
Pipeline Pressure Control - up to 4" Half PC and 2" Full PC Charged for pressure control fitting, tapping, and stopping on up to 4" low pressure line stopper (Half PC) and 2" standard line stopper (Full PC) $2,163 Per fitting.   Where applicable, street repair charges will be added.
Pipeline Pressure Control - over 2" through 6" Full PC and Flange Tee Charged for pressure control fitting, tapping and stopping on over 2" through 6" standard line stopper (Full PC) and Flange Tee $5,459 Per fitting.  Where applicable, street repair charges will be added.
Pipeline Pressure Control - over 8" Full PC Charged for pressure control fitting, tapping and stopping on over 8" standard line stopper and flange on 8" and larger diameter pipe $6,592 Per fitting.  Where applicable, street repair charges will be added.
Bollard Installation Charged for each bollard installation $113 Per bollard installation
CONSTRUCTION WORK
After Hours Construction Work Charged when after hours (weekends and weekdays between 4:30 p.m. and 7 a.m.) construction work is requested by a third party. $546 Additional fee per hour for crew. Minimum $546
After Hours Meter Setting Work Charged when after hours (weekends and weekdays between 4:30 p.m. and 7 a.m.) meter setting work is requested by a third party. $165 Additional fee per hour.  Minimum $330
Permanent Street Repair Charged when permanent street repair is required. $28 Per square foot
Permanent Street Repair - Bell Holes Charged when permanent street repair is required for bell hole excavation under 12 square feet. $330 Per bell hole
ENGINEERING FEES
Natural Gas Flow Study Charged for preparation of natural gas flow studies.   $165 Per hour
Engineering Technical Review Charged for technical review of plans and drawings. $165 Per hour
Plan Check Charged for plan check. $165 Per hour
Project Engineering Charged for engineering services. $165 Per hour
SUPPORT FEES
Engineering Support Charged for preparation, review, or approval of as-built drawings, reconciliation's, or other engineering support services. $124 Per hour
Gas Pipeline Construction and Meter Set Inspection Charged for the inspection of a gas pipeline or meter setting project.  $134 Per hour
Re-Inspection Charged for a re-inspection of a gas pipeline or meter setting project. $134 Per hour
ADMINISTRATIVE AND DOCUMENT FEES
Administration Charge for miscellaneous administrative, accounting and other overhead costs.  $1,133 Per work order
Prepare & Process Agreements Charged for the preparation and processing of agreements and other documentation, as applicable. $1,236 Per work order
Record Research A fee charged to businesses who request utility account history that is not contained in the on-line billing system.    $41 Per hour. Minimum $41.00
Right of Way Sketches Charged for review of right of way sketches. $155 Per review
Bid Package-Plan and Specifications Charge for a copy of a bid package, including plans and specifications. $134 Per set
PERSONNEL QUALIFICATION TESTING
Personnel Qualification Testing-Steel Pipe Joining - Electric ARC  Charged for personnel qualification testing for electric arc (SMAW) welding; three welds required per test. Certification required for all contractors performing SMAW work on LBGO gas pipelines. $2,163 Per test
Personnel Qualification Testing-Steel Pipe Joining - Oxyacetylene  Charged for personnel qualification testing for Oxyacetylene welding; two welds required per test. Certification required for all contractors performing oxyacetylene work on LBGO gas pipelines. $227 Per test
Personnel Qualification Testing-Plastic Pipe Joining-Heat Fusion Charged for personnel qualification testing for heat fusion; five fusions required per test. Certification required for all contractors performing heat fusion work on LBGO gas pipelines. $438 Per test
Personnel Qualification Testing-Plastic Pipe Joining-Electro Fusion Charged for personnel qualification testing for electrofusion; one electrofusion required per test. Certification required for all contractors performing electrofusion work on LBGO gas pipelines. $113 Per test
Personnel Qualification Testing-Plastic Pipe Joining-Mechanical Charged for personnel qualification testing for mechanical joining (Permanent only). Certification required for all contractors performing mechanical pipe joining work on LBGO gas pipelines. $113 Per test
       
1) These fees and charges do not apply to services provided by the Southern California Gas Company operating under franchise with the City of Long Beach.
2) Energy Conservation: A $500 per dwelling unit credit will be applied toward construction costs for LEED certified buildings.  A $1,000 credit will be applied toward construction costs for LEED certified non-residential buildings.